I want to make a career in SAP-PP/QM from the existing
manufacturing experence.
Answer Posted / rajendra
Yes, You can. But see you should be in your domain at least
for 5-6 years.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What are all the settings done for configuring the integration of pp with fico?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What is Material status and which view of the material master it is available?
How to insert an inspection checkpoint at the end of an operation?
Control keys
What is prt (production resource tools) in sap pp?
How did you configure the payscale structure?
How system calculate the actual cost?
Explain the mrp list and their uses.
What is a ‘work center’ in pp?
Differentiate ‘variant bom’ from ‘multiple bom’?
Define standard cost
List out the basic procedure for dispatching operations in capacity leveling?
What is the use of infogroups?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?