I want to make a career in SAP-PP/QM from the existing
manufacturing experence.
Answer Posted / rajendra
Yes, You can. But see you should be in your domain at least
for 5-6 years.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Why is work scheduling required for semi finished and finished products?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
Standard mrp steps
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
What is the standard info set?
How mrp (material requirement planning) types are classified?
What is the role of an administrator in pa?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What is MRO area & MRP group & some difference
Explain why their is need of production version ?
Define mrp controller
How does sap know that an operation has components as indicated by the component allocation indicator?
Different types of consumption based planning.
how many times pcc can run for one material?