I want to make a career in SAP-PP/QM from the existing
manufacturing experence.
Answer Posted / rajendra
Yes, You can. But see you should be in your domain at least
for 5-6 years.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Explain the stock requirement list and their uses.
What is the use of stock requirement list?
What is the Difference between TECO and CLSD?
Mention what is the purpose of using capacity planning?
How is the processing time calculated in a wc when both labor, machine categories exist?
In cost controlling information system mention the fields that are listed in the list screen of the report?
List out the activities carried out in production planning?
What are the levels of batch, explain batch determination process?
define variable cost
What are the parameters are there in Order type or in dependent para. config?
Explain Flexible planning Procedure?
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
What is process keys
Explain the lsmw and the steps involved in them.
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.