How much overlapping required for welding the reinforcement
bars in Columns & beams
Answer Posted / thiagarajan.m
50* d. ..ie fifty times of dia of main reinforcement
| Is This Answer Correct ? | 4 Yes | 7 No |
Post New Answer View All Answers
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
How many square meter can a worker/labor demolish a structure per day?
Form where IS456 is adopted in 1978?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
what are the Task work of different labour.?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
What is the usage of zoom command?
howto calculate the quantities of material used in fly ash brick after finding the volume??
(Project Management Topic) What are the important criteria in the successful realization of the project?