Answer Posted / rex
GROUP BOM is a bom not refernence any plant,which can
assgin to any individual plants.
BOM GROUP is a name which include some alternatives
multiple bom as external number.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is 'mps' (master production scheduling)?
How the process time is calculated in a wc when both labour, machine categories exist?
What is the difference between pp and pp-pi? Which one is better and how ?
How to attach a drawing for a material to bom ? Is it possible ?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Integration between PP and SD module.
What is meaning of customized reports?
How do you integrate HR (employee) with PP?
What are the t-codes for creating, changing and summarizing bom?
How can you create production order without routing and BoM?
How can you get planned orders scheduled so that you can do capacity leveling ?
What is meant by payscale structure? How did you configure the payscale structure?
If u maintain sub-contacting where and how will be reflect
Have you used Pull list or back flushing in REM?
In sap-pp what are the costing parameters?