Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

two or more transformer are working in parallal,one is out
of order,what are you doing?

Answer Posted / pramod

Initially reduce the load as soon as possible because it is
running in parallel means both will share the load, if
anyone out of order means the complete load will comes into
one tfr then may it will cause severe major problems.

Is This Answer Correct ?    25 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What types of CMOS memories have you designed? What were their size? Speed? Configuration Process technology?

3741


What types of question are done for diploma students in aptitude test

1717


WHTA IS LIMT OF LEAKGE CURRENT OF 11 KV 1 CORE 1000SQ.MM. XLPE CABLE.LOAD ON CABLE IS AROUND 600AMP .LENGTH 500 MTRS.

2211


What is the effect of pd controller on system performance?

1159


Why does increasing the magnetic flux in the main field of a d.c motor cause the armature current to reduce??

2106


How 3 phase invertor works?

2126


I meggared my 2c*70 sq mm AL AR XLPE cable. its one end show 50 M ohm . is my cable is safe for laying. I have only one phase and neutral.

1944


what are the possible reaons & remedies if resistance of NGR getting heat up

1896


In a large office how do we calculate required number of light fittings, assuming fittings are 4x18W or 2x36W fluorescent fitting ?

1933


A system absorbs 100 k J of heat and the increase in its internal energy is 100 kJ; the work done is

1333


Explain how you intend to work under pressure to meet up with deadline target?

5268


is oil viscosity affect on motor current?

2044


why we permissive overreach in distance protection.where it is applicable to use in long r short lines

2804


I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?

2030


For electrical designers what are the standard should know? i want learn about this standards. how to get information/reference. anybody help in this regards please.

2201