How to find quantity of cement mortar?
I want to know the req quantity of cement for plastering 300
sft in final coat with 12 mm. Any math involved? Plz help
Answer Posted / sudiptodas
its simple
1st step to fined the volume of mortar
as per question
300 sft=27.28m*m
thickness of plaster= 12mm
so volume of plaster= 27.28*.012=.3336m3
this is wet volume.to transfer in to wet
.3336*1.54=.514
this is your total mortar
conceder 1:3 mix
so cement= .514/4=.128= 3.7 bags
sand .128*3=.384m3
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is the density of most of construction materials?
What in your past experience or education prepares you for the position for which you are applying
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
Explain the Strength of brick?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
how can i calculate cement in brickwork
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Mention what are the composition of a landfill?
How do we test on design and style in a software?
Where is the worlds longest elevator and how long is it?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
What are the RISKS during the project construction?