Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why battery set is required for D.G.set?

Answer Posted / javed

It is used for starting purpose and it may also use for PLC supply.

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.

1772


what is the difference between rectifier and converter and commudator?

1921


DG Earth Value?

2286


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1762


what are the protecyion of transformer & generators

1961


ROC converges if poles and zeros lie inside a. Origion b. Z=1

2237


Can you tell me more about pu systems (per unit systems )calculation in large power systems? how to get the base for voltage and power in generator, transformator and transmission lines?

2267


I want d.g.set our company

1855


What is inrush current?

1148


how you configure motorvision relay (L&T make)from DCS

4860


What is meant by reverse polarity and how it can be fixed?

1246


Explain the function and difference of Restricted earth fault, simple earth fault and sensitive earth fault with connection diagram.

2635


Single line diagram for dbb (double bus bar)system.

1928


What are the internal and external faults?

1079


how to electronic energy metter failed in electomagnectic fild passing in the metter and which thing to defect more on metter.

1950