Note: For 1m3 wet concrete = 1.52m3 dry concrete approximately
SP.Wt of concrete= 1440 kg/m3 (or) 1.44 t/m3
1 bag of cement = 50 Kg
Example:- for 20 m3 volume of concrete.
a) Quantity of cement required = (1:2:4)
=1/(1+2+4) x 1.52 × 20 = 4.14m3 x 1440/50 =119.26 bags
b)Quantity of Sand required = (1:2:4)
=2/(1+2+4)×1.52x20=8.28m3 OR =4.14 x 2=8.28 m3.
c)Quantity of course aggregate = (1:2:4)
=4/(1:2;4) x 1.52 x20 = 16.56m3 OR =4.14 x 4= 16.56m3.
If qty. calculate in Kg just multiply by its Sp. wt of sand
or aggregate.
| Is This Answer Correct ? | 68 Yes | 28 No |
Post New Answer View All Answers
What is rate of concrete surface rendering work per sqm
Name the main components of a cad gui?
What is the meaning of soil reinforcement?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
what is pouring and explain
2. What are the advantages of your present job, things you like about it?
what is BPM in concrete demolition hammers. what is better a higher value or lower
how can we construct building without foundation providing only grade beam at ground level
can i get civil engineering test papers.......?????
When column of building is abutting the boundary line,then suitable footing advised is
what does the track parameter mean in staad.pro?
Define line type?
What is need for setting limits?
Formula of mid span bar