Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

tell how to calibrate a magnetic flow tx, vortex flow tx,dp
flow tx,nozzle flow tx and venturi flow tx?

Answer Posted / karthik

You give to us we will use calibration to calibrate the
above meters

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2177


what different types of problems do occur while doing instrumentation commisioning and how to solve them? please explain in detail

1765


why would you like to join our company

1373


Which type of pressure can be measured by these elements?

1139


How to calibrate an pressure gauge with yantrika test bench?

2912


how is work pressure switch& level switch?what is the principle of this?

2665


What are primary elements of measuring pressure? Which type of pressure can be measured by these elements?

1053


What is voltage regulator?

1110


Reason for capillary type dp level transmitter fluctuation

1986


Capacitance, resistance ( colour coding ), parallel & series circuits.

2230


Why MUX JB's are using only Temperature Element in Fundation field bus?

2337


-/5A. What is the meaning and limitations of this in energy meter constant. It is a 3 phase LT Energy Meter. If this Energy Meter is connected through a CT of ratio 200/5 Amps, then what is the multiplying constant and how its will be calculated.

2460


what are the diff. in servo and regulatory control?

3980


How many ohms are required for proper earthing?

1099


detail of mass flow meter pricipal

2305