Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

can we run a motor rated 50Hz,415vac,1440RPM At higher speed
then rated on name plate with the help of VFD /drive on long
term basis.wheater it will effect the motor life

Answer Posted / m bilal akram

yes we run motor long time with use of VFD because VFD
maintain V/F ratio every time.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Tell me about ur past electrical maintanence job

1839


I want to ask that is there any relation between current denesity of copper and material purity. also is ther any standard which defines the standard current denesity of material.

1898


Assuming that a dedicated neutral earthing transformer is provided for each GT generator, when the two generators are running in parallel, has consideration been given that the earth fault current from one generator stator winding be split between the two neutral earthing transformers? If so, what adverse impact will this have on the operation of the 59N and 27TN devices?

1612


bitumar

2246


What is the formula to calculate a three phase alternator

2273


Can we use shunt trip coil instead of trip coil with protection relay for protection?

1691


Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

1847


what will happen if earth of 33 kv cable (earthed system) is not connected to earthing pit?

1978


What is the approximate value of stacking factor?

1105


I am abt to give IOCL intrv.Plz sir guide me for IOCL intrvw (Electrical).Which subject to be consider. questions are generally asked from which subject.Plz help me out.

1942


What is voltage divider rule?

1137


What is the use for cable entry in control room?

1111


i have applied for junior engineer 2 c&w for Guwahati RRB please send me last five year question paper

2114


What is the difference between single core 2 wire and single core 3 wire system? Which application we are using this? and for What purpose we are using this?

2294


What if high voltage side circuit breaker of a ehv transformer instead of lvcb? Kindly elaborate.

1699