Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?

Answer Posted / engineer m.aziz

first of all We should conseder in our colculation the
ratio of cement,Sand , aggregate and water cement ratio
which we have received from mix design test

Is This Answer Correct ?    23 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

3130


what is civil engineer greatest strength and weakness?

13906


What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

2286


Why should you consider yourself fit to be hired by jindal steel.

4443


Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.

2005


what are RIB slabs explain about it

2649


will fix foundation bolts at site with out template is there any procedure?

2642


why we are using stub column..? is it possible to construct steel stub column..?

2006


What materials were used to build the golden gate bridge?

1312


400 ku d/c clearess ketan hota hai?

2042


Who name us Engineer & Why?

2514


how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...

2373


a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer

2556


Why Should Curing Not Be Done By Ponding And Polythene Sheets?

1300


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

3627