What is meant by single cycle plan ?how it works?
Answer Posted / yoganand goud.
To represent simple maintenance cycles, you can create a single cycle plan.
there are two types of plans in single cycle one is time based and another one is performance based.
TIME BASED:Maintenance is performed in specific cycles for time-based maintenance planning, for example, every two months or every six months.
PERFORMANCE BASED:With performance-based maintenance plans, you can plan regular maintenance based on counter readings maintained for measuring points at pieces of equipment and functional locations.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What are different reports related to catalog in sap pm?
What steps must be defined in customizing for alternative labeling?
Which maintenance plan is suitable for managing outline service agreement and what call objects are required?
Which task lists are object based?
Explain the key steps performed in refurbishment process?
What do the ie05 tcodes in sap- pm mean?
We have cost center in main work center as well as in equipment master? What is the purpose of maintaining cost center at both places?
What is shift factor? Explain with example.
Is purchasing information (vendor, date of purchase, etc.) Copied from mm to the equipment when it is being created ?
What is maintenance item?
What are the different reports under plant maintenance in information system?
What are mttr and mtbr reports?
What is maintenance plan? Name all types of maintenance plans.
Is it possible to determine header tasks automatically at save without selecting the save + determine tasks button?
Is it possible to assign a user status to the operation and sub operation of a maintenance order?