in 1:2:4 concrete, spcify 1,2 and4 as towhat they indicate?

Answer Posted / amol v. patil

In 1:2:4 concrete, this is actually the mix proportion and varies from M5 to M100 as per my knowledge.
The ratio is generally 1:n:2n
The first number 1 refers to volume of cement.
The second number 2 refers to volume of sand.
The third number 4 refers to volume of coarse aggregate.

i.e., if cement is 50 litres, then sand will be 100 litres and coarse aggregate will be 200 litres.
Actually we have to convert cubic feet of these materials to litres and then apply.

Thank You.

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2047


How to calculate the crank rod in slab

1890


load combinations how many types for staad design purpose?

1726


Which are the Steel tests ?

735


Would you cause a 55-gallon drum of water to weigh more by climbing in?

671






A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

1829


Define What is a kip?

722


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1504


all technical question

1673


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

1892


How do we determine the specific gravity of a cement?

651


How to do bbs in excel format

1589


whaat is blister in box girder bridge and what is its function..

4373


What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)

2030


How to activate isometric axes in cad?

723