in 1:2:4 concrete, spcify 1,2 and4 as towhat they indicate?
Answer Posted / amol v. patil
In 1:2:4 concrete, this is actually the mix proportion and varies from M5 to M100 as per my knowledge.
The ratio is generally 1:n:2n
The first number 1 refers to volume of cement.
The second number 2 refers to volume of sand.
The third number 4 refers to volume of coarse aggregate.
i.e., if cement is 50 litres, then sand will be 100 litres and coarse aggregate will be 200 litres.
Actually we have to convert cubic feet of these materials to litres and then apply.
Thank You.
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
How to calculate the crank rod in slab
load combinations how many types for staad design purpose?
Which are the Steel tests ?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
Define What is a kip?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
all technical question
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
How do we determine the specific gravity of a cement?
How to do bbs in excel format
whaat is blister in box girder bridge and what is its function..
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
How to activate isometric axes in cad?