in 1:2:4 concrete, spcify 1,2 and4 as towhat they indicate?
Answer Posted / amol v. patil
In 1:2:4 concrete, this is actually the mix proportion and varies from M5 to M100 as per my knowledge.
The ratio is generally 1:n:2n
The first number 1 refers to volume of cement.
The second number 2 refers to volume of sand.
The third number 4 refers to volume of coarse aggregate.
i.e., if cement is 50 litres, then sand will be 100 litres and coarse aggregate will be 200 litres.
Actually we have to convert cubic feet of these materials to litres and then apply.
Thank You.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
What is the usage of zoom command?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
detailed calculation of the amount of cement used?
pls give me ans to ACT formula cube testing porpuse
what would be the design load of R.C.C Cooling tower per cell.?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
residential projects,structural.
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
types of survey and levelling instrument ?
What do we mean by partial moment release ??
Consumption of Binding wire for fixing of cover block in vertical surface
What are the methods of measurement? Describe it shortly
Is there any course for billing available in Mumbai? If yes then please mail me the details..