Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"

Answer Posted / md gyasuddin ahsan

Sorry For above Answer

By Analysis of Rate-2007

#Bricks of class designation 7.5 in foundation and plinth
in :-
Brick with wastage = 494
Mortar = .25
Cement Ratio is 1:6, then
Cement=(.25/(1+6))*1 = .0357 cum
Cement in Bags = .0357/.034722 = 1.0286 bags

Sand = (.25/(1+6))*6 = 0.2143 cum
= 0.2143 * 35.29 = 7.56 Cft
# Bricks of class designation 7.5 in superstructure above
plinth level up to floor V level in all shapes and sizes
in:-
Brick with wastage = 494
Mortar = .22
Cement Ratio is 1:6, then
Cement=(.22/(1+6))*1 = .03143 cum
Cement in Bags = .03143/.034722 = 0.905 bags

Sand = (.22/(1+6))*6 = 0.189cum
= 0.189* 35.29 = 6.655 Cft

Is This Answer Correct ?    20 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I have an span length 16 ft c/c

1514


what is the steel difference between np-2 and np-3 pipes and weight also

2183


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1908


How many pyramid in egypt?

1108


What is Heavy Concrete & Normal Concrete

2891


List out some of the checking’s, done at the completion of construction?

1277


While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

1235


Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?

1503


how to prepare site mix design

2006


What is Critical path in Ms-Project ?

1252


A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

2308


What is thumb rule in quality and quantity estimation of a Residential building??

1716


how much tempareture are required to make liquid state of pid leed

2281


How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??

2157


what is that one cub metre plaster in cemant and fine sand

2143