how to calculate sand, cement quantity for plastering (1:5)? what"s the formula?
Answer Posted / raja j
mortar ratio =1:5
assume = 12mm as plastering thickness
calculating 10m2 of plastering area:-
volume=10*.012=.12m3
add 15 % for wastages = =.12*1.15=.138m3
so sand required for 10m2=.138m3
cement required for 10 m2=(1440/5)*.138
cement=39.7kg
| Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
Which percentage of carpet area use in plot area of office building.
what is the meaning of 40/20 src
What is modular elasticity?
What is made from large rocks, which protects the base of cliffs?
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
what is the ingredient value of 40mm and 20mm aggregates?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How many Sft of Level Plaster per Kg
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
What are the uses of groynes?
What are the disadvantages while using stone dust as filler in pavements?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
Which is the direction of negative angle?