What is the different between end-to-end project
implementation and project life cycle?
Answer Posted / patel
End to End Project: It means in SAP implementation all modules are configured at the same time which means implementation is not done module by module.
Project life cycle: It is the ASAP methodology. It is a method to implement ERP software so the program can be executed.
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
How can you manually clear open items? When? : fi- general ledger accounting
what do you mean by the field status group?
Define cost center accounting (co-om-cca)? : co- cost center accounting
What are the implications if the operation scrap is maintained in the routing and if it maintained in the bom?
What is an activity type? For each work center what are different activity types that can be performed? : cost center accounting
What is a posting key and what does it control in sap ?
What are the issues you faced after the implementation project in go-live?
What items are required in a financial statement version? : fi- general ledger accounting
What are characteristics and value fields?
What are the configurations for bank statement processing? : fi- general ledger
Differentiate between the parking and the holding of documents : fi- general ledger accounting
whenever run depreciation, automatically updation income tax depreciation with the same percentage?What is the problem?can u give me solution?
i want to check whether the particular cost center is assigned to which Controlling cycle.
please any body can tell me ,what reponsibilities and roles should a sap fico consultant do in the job
Explain the two uses of blocking an account? : fi- general ledger accounting