how much quantity a carpenter do shuttering per day
Answer Posted / srimanta
Contractor carpenter can do 10sq mt slab&beam shuttering per day.
Is This Answer Correct ? | 12 Yes | 15 No |
Post New Answer View All Answers
Why are the bolts that hold steel rails together in oval holes?
crank types
what is Brick crushing strength(PSI)?
What is meant by a context menu in a cad software?
What is the purpose of the gap in the road on this bridge?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
What year was the keystone power plant in Indiana County constructed?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
What should be the standard roof height like to be?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
What are the materials used in building a gravity dam?
how to tie 10 legged stirrups
how to calculate quantity of bricks in circular manhole with examples.