Answer Posted / syed shoeb ullah hussaini
look man ... In c.t load is
connected to the primary
winding and ammeter is
connected to secondary
winding hence there no fuse
in c.t .... Similary there no fuse
in potential transformer as
the voltmeter is connected on
secondary side with closed
loop of secondary and
winding .... P.t is step down
transformer hence in this also
no fuse is used .... Its was a
trick question to measure
your knowledge
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
What is different between Circuit breaker and Isolater?
Where is the best place to mount distribution panel in a house.
Why negative feedback is preferred in the control system?
how to synchronize 3 phase slip ring induction motors of different ratings.
Why a Permanent Magnet Generator has higher frequency as compared to frequency of main alternator?
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
What is stacking factor? What is its approximate value?
would you please give me any idea about the BARC interview question on electrical? i have an interview on 1st july.....plz hlp me.......its urgent......
Why mostly the HV side of transformer has Delta?
What happens if i apply 500V to 440V rotary Switch ?
what is high and low cut off voltage of BB and DG at SPS????????
DC transmission
what is the VA(Volt-amphere)? define with calculation?
Minimum IR value of 1.1 kv grade 3.5c (300, 240,185,150,120,95,70,50,35,25) sqmm Aluminium XLPE cable and 4c (16, 10,6 & 4) sqmm cu arm cable between RY,YB,BR,RN,YN,BN,RE,YE,BE & NE.
typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?