what is ECC in current version of sap r/3 ECC6.0.
what is full form of ECC6.0?
Answer Posted / bedprakash
ECC stands for Enterprise Core Component.it's current version is ECC 6.o.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to create module pool program using table controls based on selection criteria specified for sales document item in the first screen and item details in the second screen. plz mention the detail coding Tahnks, Rahul
What are the features of abap/4 dictionary? : abap data dictionary
What are the events in classical reports?
In sap scripts, how will you link form with the event driven?
Does the external program run in the same sap luw as the caller, or in a separate one?
Difference between stand alone CRM and back-end CRM
What are clustered tables?
What is sap locking?
What is the maximum number of match code id's that can be defined for one match code object ?
Explain buffering
What are the types of bdc s?
What are the page windows?
what is defference between repository and non repository Object?
What are the different types of abap/4 programs?
What are the basic objects of the data dictionary? : abap data dictionary