Answer Posted / arsh
shallow well =can not give more than 5 litres per second
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
what is the method used for marking of cantilevers in hirise buildings by using theodolite
what is SDLC ?and write a 'c'program for to swapping the three numbers?
Explain the design for rcc multi-storied building?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
what is cement wastage percentage in NHAI ROAD WORKS
What is Grid floor and mention its advantages ?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
List out the types of roofs?
Difference between pre-tensioning and post-tensioning.
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.