Line PT is connected in the incomer (line) to detect the
voltage of the incomer whereas bus PT is connected in the
bus, 1 before the bus coupler and another after bus
coupler, to detect voltage in the bus.
The main purpose of both of them is to sense the voltage so
that the breaker can get enough information to operate..
| Is This Answer Correct ? | 54 Yes | 1 No |
Post New Answer View All Answers
All the socket in a room become very hot, the Wall was also became very hot and the earth conductor also became live, what in your view might be the possible causes?
what is the formula for computing cable tray size & capacity
1.what is the difference between transformer differential and busbar differential.2)why we are using 2 slope for trafo diif and 1 slope for busbar diff.3)what is the purpose of metrosil and stabilizing resistor in high impedance relay circuit.4)how metrosil reduce the peak volage.5)what is the funtion of stabilizing resistor
Which level of the Transformer oil got dielectric strengh? And why?
What is MSL designation of a motor and same may be provided in details.
i want to model paper for section engg.
What are the conditions to be satisfied for parallel operation of dc generators?
State uses of different types of stsrters with different capacities of motors as below: a. up to 5HP b. above 5hp to 10hp c. above 10hp to 20hp d. above 20hp
what are the industrail measures to over ferranti effect? how would the ferranti effect the power system if those remedial mearsure arent taken? how often does this effect occurs in real power system?
Why the efficiency of a three-phase induction is the motor is less than that of a three-phase transformer?
Work done in a free expansion process is
in ACB breaker requireding 3200Amps. buscoupler getting OFF mode and again it reset and getting normal position give me a required answer?
how to put cable sizing and cable glands size for respective cable & Cable Lug size in a DB sectors???
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.
The moisture in air will condense at