Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many binding wire can be required for 1 metric tonne
steel?

Answer Posted / smruti

Aproximately 6 kg to 9 kg of binding wire is required for
1MT of steel.

Is This Answer Correct ?    3 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate the chair reinforcement length in slabs, footing or anywhere??

2435


In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?

2144


why we use 19x9x9and 20x10x10 but not other

2208


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

2222


Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?

2184


What are the advantages of cad?

1148


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

2160


GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

2536


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

3106


WHAT IS YOUR EXPECTED SALARY?

2144


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1718


how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

2123


Formula of mid span bar

2002


Explain major difference between auto level and dumpy level?

1245


how calculate the bearing from two coordinates?

2311