Answer Posted / tango
In any engineering , at ground level we do grouting, we have two options either the grouting to be finished upto ground level or if we go for raised grouting in that case we go for step foundation.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
what is the coefficient for running feet to cft coversion both area and price
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
What is meant by cartesian coordinate system?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
what are the proper pipes for salt water line
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What is the difference between built area and super built up area?
What out turn civil works
Can we apply curing compound on ceiling (slab Bottom)
what is cross hair cursor?
Explain the different types of building contracts?
from where ican get sample papers for CET-delhi 2012
Advantage of Aluminum form work in terms of activities can be skip and cost too