We use Lap in construction work with TMT bars mostly we use
50xd,40xd etc. but we can not decide infect its totally
depend on Design of the building.
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
How to find CN by using arcgis 9.3?
how water proof chemicals act in concrete to avoid leek?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
What are the skills required to become an architect?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
how calculate the bearing from two coordinates?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
Explain the various stages of the project planning process in construction?