how the lap length is calculated in reinforcement of 110mm
dia steel of Length 15.00 mtrs. & grade of concrete is M20
Answer Posted / sadashiv
the rods more than 32mm dia not used for lapping accoding to
is 456 2000 go to the weld only
| Is This Answer Correct ? | 56 Yes | 16 No |
Post New Answer View All Answers
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What is the coeffiencent Friction Angle between Steel and Ashphalt?
Which type of plywood & sizes using in construction projects ?
How do you compute volume of airflow?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
What out turn civil works
What are the different theories of failure under static load?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is labor and material payment bond?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
Please design 12.5m long dubbly beam
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS