A bill was raised by contractor which read as follows
1.) Excavation in normal soil upto 1.5m - 250 cum
2.) Excavation in normal soil 1.5m to 3m - 240 cum
3.) Excavation in soft rock - 350 cum
4.) Excavation in hard rock - 250 cum
5.) Filling with available soil - 825 cum
6.) Filling with bought out soil - 1100 cum
How can I verify the above quantities, especially for item
no. 5 & 6?
What checks are necessary before releasing the bill ?
Answer Posted / gkreddy
contractor should be ansure there must
and should maitain JMR( Joint
Measurement Record) for produce the bill
otherwise bill should be rejected.claint
also insist the contractor to maitain JMR.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
how we calculate the grade of the Bituminous materials.?????
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
what is a well
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
what is the anchorage length of reinforcement.
What are the causes of building collapse?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
What is the difference between Hinged and pinned in Column ends
Formula of mid span bar
What are the ingredients of pre-stressed concrete?