Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many 1st class bricks in 1cu feet?

Answer Posted / rajeev kumar

since 1ft=12inch=12*2.5cm=30cm
now 1cube ft=30*30*30=27000cubcm
since size of one standard brick=19*9*9=1539cubecm
so no.of bricks in 1cube ft=27000/1539=17.54=18bricks but without morter.

Is This Answer Correct ?    112 Yes 54 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is meant by engineering drawing?

1017


please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering

1515


why +1 to be followed for calculating the no of bars in BBS. Please explain

1940


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

3418


What does civil engineering mean?

1039


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

6190


which are the Indian auther books for STONE COLUMN/GRANULAR PILES?

2359


How foundation is designed, Column design and beam design

2270


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

6031


I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?

2055


TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?

2107


what is the hanekom repairing material after concreting work

2346


what is the basic difference between Coloumn & Shear Wall

2133


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

2301


Advantage of Aluminum form work in terms of activities can be skip and cost too

1006