how many 1st class bricks in 1cu feet?
Answer Posted / rajeev kumar
since 1ft=12inch=12*2.5cm=30cm
now 1cube ft=30*30*30=27000cubcm
since size of one standard brick=19*9*9=1539cubecm
so no.of bricks in 1cube ft=27000/1539=17.54=18bricks but without morter.
| Is This Answer Correct ? | 112 Yes | 54 No |
Post New Answer View All Answers
What is meant by engineering drawing?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
why +1 to be followed for calculating the no of bars in BBS. Please explain
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What does civil engineering mean?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
How foundation is designed, Column design and beam design
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
what is the hanekom repairing material after concreting work
what is the basic difference between Coloumn & Shear Wall
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
Advantage of Aluminum form work in terms of activities can be skip and cost too