Tell me something about your project?

Answer Posted / usha

My project name is "WIRELESS CHARGING OF MOBILE PHONES"
Now a days everybody having mobiles,but there is no enough
time to charge it,hence this project is used to charge the
mobile phone battery after receiving power wirelessly,hence
there is no need to put the mobile phones in plug to charge it.
In our project have transmitter as well as receiver part. in
transmitter side hv transformer,rectifier circuit,micro
controller,NE555 timer,Metal Transistor,Transmitting coil
and RX side hv receiver coil and charging ckt.
The main merits of our project is
1.Required no wire
2.Easy to transmit
3.Cost reduction

Is This Answer Correct ?    21 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to tell project details in interview the project is funds flow analysis?

1160


What and where are the policy statements for software project planning?

2976


Given a MAKEFILE (yeah a makefile), design the data structure that a parser would create and then write code that iterates over that data structure executing commands if needed.

5154


How did you choose the appropriate lifecycle for your project?

2879


create a flow diagram up to 2 levels for hospital management

3216






How do you create the Software Project Management Plan (SPMP)?

4030


What is the project management structure in your project? Is a PL assigned to the project?

2025


How do you rate yourself in c#,vb.net,Asp.net,oracle,sql server ?

4961


Write the test cases for instr function?

634


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

6467


funds flows analysis how to prepare for interview

1033


Please, i am a final year student in nigeria and i have a project on pension fund administration and i need help in starting.

1866


Test the save dialog in Notepad?

4176


What is the role of CLR in ASP.NET?

3190


Explain dll hell?

654