how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / tukuna das
M30 means , proportion 1:1:2 , so that
Total Volume = 1m3
we take 52% extra for dry volume , miss handling etc then ,
total volume = 1* 1.52 = 1.52 m3
Quantity of cement required = 1.52/(1+1+2)=0.38/0.035= 10.857bags = 11 bags
Quantity of sand required = 0.38*1=0.38m3
Quantity of aggregate required = 0.38*2 = 0.76m3
| Is This Answer Correct ? | 12 Yes | 12 No |
Post New Answer View All Answers
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
What is Joule Brayton Cycle?
what is the mix design for M:60 with micro silica andmetakaoline?
1m square 20mm plastering how much of water need curing work
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
In reclamation works what are the importance of geotextiles and sand?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
how to calculate rate analysys of 1:6 plastering 10 sq m
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
What is the tensile strength of marble?
Cement consumption of one cubic meter of aerocon blocks masonry?
Explain what is Critical Path Method (C.P.M)?
Explain moment of inertia and its importance.
why do we not deduct volume of steel to find actual volume of concrete in practical???
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct