Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?

Answer Posted / tukuna das

M30 means , proportion 1:1:2 , so that

Total Volume = 1m3
we take 52% extra for dry volume , miss handling etc then ,
total volume = 1* 1.52 = 1.52 m3
Quantity of cement required = 1.52/(1+1+2)=0.38/0.035= 10.857bags = 11 bags
Quantity of sand required = 0.38*1=0.38m3
Quantity of aggregate required = 0.38*2 = 0.76m3

Is This Answer Correct ?    12 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate paint drums per meter square

2570


What are the common ways of demolition?

1282


What is the difference between tor steel and tmt steel?

1109


How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

1705


what is mean by reestimation?

1821


Why are separation membranes used between concrete pavement slab and sub-base?

1398


what is the ingredient value of 40mm and 20mm aggregates?

2014


how do you stabilize a waterlogged area in road construction

6791


What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????

3013


what mean By core Billing

2316


What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?

1854


The portion of a brick cut across the width is called?

1574


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1652


WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT

2625


how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

2161