Hi what is the difference between Enhancement and Exit.
Thanks
Answer Posted / teja
exits means u can code in the standard sap pgm but any
updation in the version of standard pgm will lead to the
loss of ur coding which is not occured in the enhancements.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is sap transport domain? : transportation management
When the system checks availability which scheduling would it use first?
How can one inactivate or block a special stock partner? Intent is to disallow transactions to this consignment location as part of lifecycle mgmt.
Explain the userexits any two?
What is the function of Profit center in Material master and how will system react when it finds Profit center in MM/when it does not find Profit center in MM? Plz answer for both the scenarios?
Can we assign multi distribution channel to a single customer in sap sd sales process. If yes then how?
What is the data used in shipment scheduling?
If you generate bill more than credit limit then what will happen?
Is it possible to create sales order for 40 items if the quotation is sent for 30 items?
In Intercompnay Billing scenario, Does Idocs get posted as we delivery is done from other plant and also the Intercompnay billing happens in the prcess. Though we have the same ERP system i.e. SAP only for all transactions.
Can anyone have any experience with the fashion version of it?
Do you know what is made to order scenario or make-to-stock scenario? SO, in the make-to-order scenario, what’s the integration touchpoint that you figure MRP? My question is when you have a make-to-order scenario, how does MRP will be figured? How system know that when you create a sale order whether the sale order is calling for make to order or make to the stock type of order, which data determined this is made to order make to stock…. The system should understand when I create an order, whether it’s made to order or make to stock, so which parameter which value that system will be determined based on that system will say okay this make to order so I need to I mean the system has to go to the next level then it’s going to the MRP all the subsequent planning will be taken taking place, what’s the parameter that we have to check?
how to and where to maintain copy controls
Can you deference between contract & scheduling agreement?
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system