Answer Posted / keshava prakash
Contract demand is the demand(load in terms of KVA/MVA)
based on the customer requirement with power supplier as
per the supply agreement. Maximum demand is the maximum
load recorded during the billing cycle (usually a month)as
per the power supplier. Billing demand is the demand
charges billed by the supplier based on maximum demand
recorded and contract demand. It varies depending on the
power supplier. For example in Karnataka state all
Electricity Supply Company under Karnataka Power
Transmission Corporation, bills based on 75% of the
contract demand or maximum demand recorded whichever is
higher in a month.
| Is This Answer Correct ? | 38 Yes | 1 No |
Post New Answer View All Answers
explain why core loss of a transformer is almost constant under different load conditions when connected across a constant voltage and constant frequency.
I need HT sphere gap calibration table. Can any body help me.
how we arrange the hv side with delta connection in case 33/11kv of transformer.
sir i completed apprentice in TNEB.apprentice is eligible for 'c' licence
explain the process of commutation in a dc machine. Explain what are inter-poles and why they are required in a dc machine.
What is super thermal power plant? and how it will differ from normal thermal power plant
What is stacking factor? What is its approximate value?
i have faced a problem in ro plant grunfos make bm30type pump it is 22kw pump. We start this pump using siemens 3rw 4423-ibc44, 30kw softstarter but this soft starter will frequently failier so we planed to change dol starter. So pls tell anybudy its possible or not.
WHAT IS THE CURRENT CARRYING CAPACITY OF 2.5/3 CORE HI TUFF CABLE,WILL IT SAFLEY CARRY 8.6 AMPS OVER 120 METRES,CAN YOU ALSO ANSWER WITH FORMULA FOR WORKINGS OUT ,THANK YOU 3RDYR APPRENTICE.
how to generator maintenance (A Check, B check,Etc)
define the active power?
if a.c supply is given to the motor,, what happen?
why ten delta testing is carried out on power transformer
Can anybody inform me about the pattern of ECIL GET( Graduate Engineers Trainee) interview for Electrical students? Will there be HR round as well? I thought of preparing for 2 to 3 subjects thoroughly. Will it be sufficient? Please share your thoughts.
What are the components of feedback control system?