what is the difference between transformer welding machine and
rectifier welding machine?
Answer Posted / csb
Function of both machines are same, the main difference is in the sense of size,rectifier type machines are compact and easy to transport from one place to other.It can easily carry in hands.But transformer type machines are heavy in construction.
Is This Answer Correct ? | 14 Yes | 20 No |
Post New Answer View All Answers
if any one who attended the caterpillar interview please send me the sample questions and the areas from which questions are being asked...
How fuel oil consumed by medium engine?
what is the effect of throttle pressure on turbine efficiency?
Dear Sir, I am Shariq Sami. I joined BHEL as a Supervisor Trainee in May 2009 on diploma basis, right now i am an assistant Engineer and posted at Noida. I have completed my bachelor of engineering from Jamia Millia Islami, New Delhi.I am Planning to appear for "BHEL ET" exam this year. I want to know,is there any previous year question papers will be available like we have for GATE exams or you feel it is no need? Can you please guide me? Kind Ragards M.S Sami, Contact No. 9891090742, 9250250988, 0120-2545796
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
why stress relieving of stainless steel is not preffered
Where can you find space heater lam p and what is its purpose?
Describe transfer machines?
For example, If raised PR (purchase request) of 1"inch ss pipe so what description in mention in purchase request?
What are the types of pump can be found in the engine room
What is welding?
can any one pls refer me any sites which have notes regarding Body-in-white(welding fixtures)...pls
What are the different types of fits? Explain
Define extrued aluminum?
how we can calculate the air consumption of any system.