Answer Posted / nayan patel
WE MUST PROVIDE THE LAP AT THE HALF LENTH OF COLUMN. LENGHT
OF THE COLUMN IS EQUAL TO THE CLEAR DISTANCE BETWEEN TWO
ENDS
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
what is labour consume factor in residential projects
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
How can i do RCC rate analysis?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
Explain major differences between routing maintenance and major maintenance.
How do you calculate reinforcement weight of steel?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
What in bending moment, if a moment is free end of cantilever beam?
what is the permanent solution applied for restoration of leaning tower of pisa?
What does civil engineering mean?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
what is stressing