how amny bricks of size 240 mm X 120 mm X70 mm are required in
100 cubic meter brickwork. How much cement is required at 10
mm masonry and at 4:1 sand cement ratio and how much cubic
meter of sand is required for the above work.
Answer Posted / shyam sundar mondal
10mm th. with morter brick size=.25x.13x.08=.0026cum
volume of one brick with morter =.0026 cum
No of bricks one cum brick work = 1/.0026=385 nos
volume of one brick without morter = .24X.12X.07=.002016 cum
volume of morter =.0026*385-.002016*385 cum =.000584*385 cum
=.22484 cum
Dry volume of morter =1.20x.22484 =.2698 cum
Cement required = .2698/5=.05396/.0347*50=78kg
sand required = .2698/5*4=.05396*4 = 0.2158 cum
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
What is an ortho mode?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What is .Dwg?
What is the difference between shear and tensile strength?
what course did you consider thinking before you enrolled in college?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
how clculate excavated or backfilling quantity by simpson's rule
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
how i can tak Quantity of mortar in block work
Why should you show Client/Engineer activities clearly on the project plan?
What are the advantages of cad software?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?