Complex BOM Scenario with Condition type and copying control
Answer Posted / shriyasuhaas@gmail.com
Hi Chin
There are few settigns that you need to do for the BOM to
be exploded or notto explode
1. In the item category vov7 you have the BOM element box
that needs to be checked if you want the BOM to explode and
this check to be removed if youdont want the BOM to explode
2. In copy control at item level wehn you copy from contrac
to order or from quotation to order see if the restructur
BOM IS CHECKED OR NOT. This indicator controls the
explosion of BOM
3. If you want the price of the BOM to be exploded at itme
level in the Basic settigns go to pricing and in that go to
pricing at ITEM levels and see if the TAP item category has
a statisitical condtion check if so please remove it
and there should be no pricing or cost check in the
statistical condtion . This will allow you to price the
component at item level too
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How is sap transportation management different from the sap erp logistics execution transportation solution (le-tra)? : transportation management
Hi, wrong work item in universal work list.what could be the reason and where to check? can any body guide me thanks
one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance
Explain what is the difference between sap credit memo request and sap credit memo?
What are mrp types?
Which type of aptitude question
Once you create a sales order, how do you confirm to the customer like I have the stock for ATP to check for the customer?
Output with different language is it possible to have two delivery notes in two different languages?
is LE module is better than SD module to get a job in SAP? becouse i think sd consultant are more than LE is it?
What is post goods issue (pgi) ?
What two ways of number assignment for documents or master data do you know? Explain the difference between them.
What are the configurations steps for packing?
What is the difference between the delivery document & scheduling?
while creating order in am getting an error company was not supplied in function module interface how to resolve
Which organizational element is central in shipping?