Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation

Answer Posted / arun

DETAILS:

cement = 1,
sand = 2
metal = 4
so wat is the ratio we want mixing (1:2:4)=1+2+4=7
7 is mixing propotion
volume of wet cement conceret is 1.54 to 1.57

unit weigth of cement is 1440kg/cum

one bag of cement =50/1440=0.034722 cum

solution : cement = 1.54/7=0.22
0.22/0.03472=6.33 bags
one bag of cement = 50kgs
=6.33*50kgs=316.82 kgs

solution of sand = 0.22*2=0.44cum

2 is the mixing of propotion

soolution of metal = 0.22*4=0.88cum

4 is the mixing of propotion

say i cum of cement conceret 1:2:4 ratio

cement = 6.33 bags

sand = 0.46 cums

metal = 0.88 cums


this is one type of solution

unit weight of cement is 1440kg/cum
sand 1660 to 1800kg/cum
Unit weight of metal is 1630kg to 2000kg/cum

so cenment = 1.54/7=0.22
0.22*1440=316.82 kgs/cum
sand = 0.44*1750=770kgs/cum

metal = 0.88*2000=1760kgs/cum

Is This Answer Correct ?    92 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

For what purpose bedding is used under storm water drains?

1124


how to calculate total cost for slab 35'×8'

1933


What is an object snap mode?

1197


How to identify the vitrified tile and ceramic tile by observation only after executing the job.

999


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1751


What is construction mitigation management?

2336


Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

2125


What does civil engineering mean?

1108


What do we mean by partial moment release ??

3907


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2138


Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

94722


beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

2089


what does the grad of cement shows (denotes)?

1616


what will be price of 1:2:4pcc per kg?

2114


cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building

2447