What is the calculation for finding cement and sand for 10' * 12' area ratio 1:6 thickness 12 mm
Answer Posted / anil
how calculate sand
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
The 4 main factors to start a construction project are––
What is the strongest bridge for a school contest?
how to caluclate sienerge qty in construction in ap
Will going from a 3-tap to 6-tap increase water pressure?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
Which are the Steel tests ?
400 ku d/c clearess ketan hota hai?
How to cal. The weight of hollow pipe?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the design procedure for building
What are new methods /technologies of pothole patching?
What is the diff between cad & cadd?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Define What happens to Load at yielding ?