Hi can any one please send me bank po's aptitude question
and answers model papers
Answer Posted / yogita amritkar
answer is 10
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
if out of x bulbs y bulbs are broken;the % of non broken bulbs
the ticket sales s for a company increases 25% from standard sales to 60 tickets sold, then 60 - s =:
If A=Z, B=Y, C=X, .......... Z=A, Then SOUR = ?
A person who decided to go weekend trip should not exceed 8 hours driving in a day Average speed of forward journy is 40 mph. due to traffic in sundays, the return journey average speed is 30 mph. how far he can select a picnic spot
4 pipes inlet and 2 pipes outlets, find water inlet etc.
Four persons can cross a bridge in 3, 7, 13, 17 minutes. Only two can cross at a time. Find the minimum time taken by the four to cross the bridge.
I had Rs.100 and I play. If I win I will have Rs110 and if I lose I will have Rs. 90. at the end I have 2 wins and 2 lose. How much do I have?
In a digital circuit which was to implement (A B) + (A)XOR(B), the designer implements (A B) (A)XOR(B) What is the probability of error in it ?
A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?
Which number does not belong to this series 1,1,2,3,4,5,8,13,21?
The equivalent compound ratio of 5:6::7:10::6:5
There is a rectangular terrace whose length and width are 60m X 20m. There is a walkway of uniform width around terrace. Area of walkway is 516m^2. Find width of walkway:
If the vertex (5,7) is placed in the memory. First vertex (1,1) ?s address is 1245 and then address of (5,7) is ----------
Here are 140,0000 pencils out of which 80 % of pencils have average length of 5 inch. What will be the total length, if they are kept one over another? What will be the distance in miles?
2 persons can finish a job in 8 days. First person alone can finish the work in 24 days. How many days does the second person take to finish the job?