Which BOM maintenance functions do you require (copy
functions, mass changes, and so on)?
Answer Posted / shrikant
cS20 is generally used to mass change for a single component
used in many BOMs, it can be change with another material,
Change the Quantity, Delete the Material, and so on, But
CEWB is on of the transaction used to do many things with
number of BOMS at a time, such as Change the Prod storage
location, Quantity, deletaion, addition, etc
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What do you mean by pooled capacity?
What are the reports generated in product cost controlling information system?
What is planned consumption and unplanned consumption?
What is the planning time fence?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Special Procurement type 40 – proc. form alt. plant
What is MRP Area or How can I excluede one storage location stock from MRP?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
How can you create production order without routing and BoM?
What is Individual and collective requirements and differecne between them in MTO scenario?
Different types of Object Dependencies.
Difference between PP and PI.
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
What are the questions we need while we go company for analysis to implementation SAP? What we need to know generally? How can we define we need abab for improvement?
What is the use of mrp pp evaluations?