Which BOM maintenance functions do you require (copy
functions, mass changes, and so on)?

Answer Posted / shrikant

cS20 is generally used to mass change for a single component
used in many BOMs, it can be change with another material,
Change the Quantity, Delete the Material, and so on, But

CEWB is on of the transaction used to do many things with
number of BOMS at a time, such as Change the Prod storage
location, Quantity, deletaion, addition, etc

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What do you mean by pooled capacity?

1905


What are the reports generated in product cost controlling information system?

628


What is planned consumption and unplanned consumption?

2337


What is the planning time fence?

596


We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?

671






Special Procurement type 40 – proc. form alt. plant

2124


What is MRP Area or How can I excluede one storage location stock from MRP?

1311


What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?

1708


How can you create production order without routing and BoM?

1022


What is Individual and collective requirements and differecne between them in MTO scenario?

1572


Different types of Object Dependencies.

1058


Difference between PP and PI.

1599


In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?

608


What are the questions we need while we go company for analysis to implementation SAP? What we need to know generally? How can we define we need abab for improvement?

1430


What is the use of mrp pp evaluations?

659