what is mixed design, define it?
what is way beecher?
Answer Posted / madhu
Mix design is simply denotes proportion of material
constituents which is used like concrete,mortar. prportion
depende on project/specification requirements depends on
material source availabale as well as properties.
Proportion of material will be calculated by laboratory
which will result from properties of material.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
When was the first motorway built in england?
What is the name of this multiplication factors ?
What is the sugested procedure of water purification for public supply?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
What glue is least sticky?
whats is difference between anchorage length and development length
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
door and window wood work calculations and different methods
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
what do you know that m20,m25
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
What is the cost difference between site mix and ready mix concrete per cubic meter
silt%= silt volume/ silt+sand volume is this right?