For Synchronisation of DG Sets Sometimes we people use NIC
(Neutral Isolation Contactor) Instead of 4-pole ACB or any
switchgerar..Please guide me why is it so????
Answer Posted / vinod
when a DG set is started and as dg voltage is building up it is necessary to connect the lowest potential point of generator first with the system which it is to be feed, that is the neutral as first. then the breaker can be closed if the set is required to be parallel first. the reason is the system which the DG is intended to supply may have a neutral potential which can be at a different potential other than the DG. so in order to establish a common neutral NIC is used. if NIC is not there and DG neutral is always solidly connected to the BUS then grounding impedance of the whole system is reduced and in turn fault in system can lead to a higher fault current.
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
What are the ratings of VCB, MCB, MCCB, SF6, ACB, and OCB?
what is the physical connection of a analog i/p to a analog i/p module (ab plc)and through a analog o/p module(ab plc) to a analog o/p . and how all the process control by scada
why dc is used in control circuit for mv & hv switchgear instead of ac
Draw a block diagramof Three UPS systems connected in Parallel mode?
we all know voltage is a force(emf), and the force always devides if 2 or more than2 loads are there but why does the voltage remains same is parallel, it must devide na ???
if a 3phase 100kva distribution transformer , 400 v,50 hz, 4-wire system is loaded at 160 k.w mostly 1-phase Lighting & Airconditioning split a.c load what will be the net effect on the power system in terms of voltage, powerfactor, current , efficiency of xformer
What is T’Q and X’Q and X’D ? and what is saturated as well as unsaturated ?
It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.
WHAT IS DEAD END IN PROTECTION?
what is charger supervision and control supervision?
HOW TO CALCULATE AMPs OF CURRENT TRANSFORMER IN HT Panel
How to use computer cpu ups use for home inverter circuit board
what is the diff. between x'mer , isolation x'mer & ultra-isolation x'mer ?????????????
what is the transiant condition in alternator? and how it can be prevanted?
What is error of a measurement?