what is the procedure to isolate flow a transmitter and
flushing it?

Answer Posted / suresh agravat

First close root valve
second isolate manifold valve
open equaliser valve it was zero check procedure
open root valve
open manifold isolated valve
close equaliser valve it was taken in line procedure.

Is This Answer Correct ?    0 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW TO CHOOSE FREAQUENCY IN FMCW TYPE RADAR INSTRUMENTS. DESIGN BASIS OR DESIGN CALCULATONS ?

1698


How an rtd work, and what volts/current goes to a rtd to measure the resistance?

730


what is the procedure to callibrate temp controller ,pressure controller,etc. suppose a temp controller showing error 1.5 degree centigrate how can i minimize it.

1866


what is the calibration procedure for magnetic flow meter @ onsite

1202


Explain bernoulli’s theorem.

614






How to Calibrate Flammable gas detector in field

720


how can i check vortex shedder bar it is ok? if there is ohms condition are shown correct?

1711


what is gas metering system? gas chromatograph? and gas compressors?

1962


what will the sending unit in the fuel gauge utilizes?

1467


what is your eligibility criteria for freashers?

1634


Describe the typical instrumentation used in monitoring the performance of a shell and tube heat exchanger.

1542


what is easiest way to read STL language in PLC?

2661


what is the difference between Cv and air consumption? why the customer needs Air consumption details?

1520


what is the reason while warning lamp is on while the engine is cranking?

1620


How to calibrate RC Feeder system in thermal power station?,If any instrument available to calibrate it,ple inform me. make:stock,

2716