Can anybody tell me application of PLC,DCS,SCADA.
Answer Posted / anisha
PLC and DCS are used based on the application such as where
programmable controlling is required. It has a controller in
it with inbuilt communication protocols. PLC is used in
small scale controlling application inorder to automate it
whereas DCS is used for controlling a large scale automated
industries. whereas SCADA i.e Supervisiory Control And Data
Acquisition. It is used for interfacing Purpose and
supervisiory.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
List three types Level Switches with their working principles
What is force balance principle?
What is intrinsic safety mean.
tell me the field & lab calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter, temperature transmitter, temperature indicator, flow indicator, level indicator, control valve, thermocouple, pressure indicator (digital & analogue),
how to calculate orifice sizing? and tell me if pipe size bet 50mm t0 200mm then we can use pipe flange??? and above 250mm pipe size should i use D & D/2 Flange? is it right or wrong?
KAlman filter code for two dimension?
What is motion balance principle?
how to connect transmitter measuring sulfur process? 1-by using long impulse line or 2- by using coated short impulse line
I have completed B.E. Instrumentation & control in 2009. i have 3 year industrial job experience in chemical plant.now, I want to join M.E. in external. so, Plese say easiet way and good institute name.
send me HPCL paper
how do i tune dearator pr control valve using PID. we set the set point is 0.6kg/cm2 now i want 0.5 to 0.7kg/cm2 limits so what should i give p,i,d values. then pls explain how do set pid values for control valve tuning?
which type inter lock use in petrochemical refinery,and oil & gas?
Explain about the leakage class of the control valves
Explain PID controller tuning & any one method used for it.
i have done DAE in Instrumentation and Process Control. i have applied for an apprentice training in chemical company after three day my interview will be conduct but i need more information about industrial process control and controller. my e mail is imran_dilsetu@yahoo.com please tell me interview question relative to instrumentation ?