how to calculate rate analysis of M25 grade concrete
Answer Posted / k v arjuna rao
As per material availability the ratio's of Sand Aggregate
and Cement including admixers calcuted per cum by design
mix.
The quantites of these material is multiplied with existing
rates including Transportation charges we get the Material
cost per Cum.
Then Labour required per cum is calcuted as per CPWD
Standards and multiplied with local labour rates given by
State Govt SSR or CPWD SSR for that area. we get labour
Rate for 1 Cum.
Finally add hire charges of machinery used for mixing and
pumping and placing of concrte, Sunderies, water charges &
Overheads & Profit for contractor on Material rate & labour
rate.
finally we get Rate per Cum.
| Is This Answer Correct ? | 20 Yes | 8 No |
Post New Answer View All Answers
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
what is idealized curve for concrere and steel
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
What will you do if you encounter problems like accidents?
Does VDF add strength to the flooring apart from preventing water ingress?
how much cement and sand required for 1cum rr masonry
What are the composition of a landfill?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
what is the percentage of silt in black cotton soil.?
What is kn measurement?
how we calculate the grade of the Bituminous materials.?????
what is the procedure of wet seiving. n percentage of silt in different type of soil?
what is the productivity in aluminium shuttering per day
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???