how to calculate rate analysis of M25 grade concrete
Answer Posted / k v arjuna rao
As per material availability the ratio's of Sand Aggregate
and Cement including admixers calcuted per cum by design
mix.
The quantites of these material is multiplied with existing
rates including Transportation charges we get the Material
cost per Cum.
Then Labour required per cum is calcuted as per CPWD
Standards and multiplied with local labour rates given by
State Govt SSR or CPWD SSR for that area. we get labour
Rate for 1 Cum.
Finally add hire charges of machinery used for mixing and
pumping and placing of concrte, Sunderies, water charges &
Overheads & Profit for contractor on Material rate & labour
rate.
finally we get Rate per Cum.
| Is This Answer Correct ? | 20 Yes | 8 No |
Post New Answer View All Answers
how do we design mix ratio?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
How and where are aqueducts built?
what is kribs is supporting?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
what is pouring and explain
What is the difference between a wood shake and wood shingles?
why does the most of civil engg is not intersted to going for teaching field?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
States some of the tool bars used in cad?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
What is thumb rule for deep trench excavation
How to hide dimensions in autocad?
Civil engineering related
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3