how to calculate rate analysis of M25 grade concrete

Answer Posted / k v arjuna rao

As per material availability the ratio's of Sand Aggregate
and Cement including admixers calcuted per cum by design
mix.
The quantites of these material is multiplied with existing
rates including Transportation charges we get the Material
cost per Cum.
Then Labour required per cum is calcuted as per CPWD
Standards and multiplied with local labour rates given by
State Govt SSR or CPWD SSR for that area. we get labour
Rate for 1 Cum.
Finally add hire charges of machinery used for mixing and
pumping and placing of concrte, Sunderies, water charges &
Overheads & Profit for contractor on Material rate & labour
rate.
finally we get Rate per Cum.

Is This Answer Correct ?    20 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much material is required for constructing a 2 Lane 2Km rigid pavement road

1728


Permissible wastage of cement as per IS code ? In which IS code I get it?

1206


Define What is a projection line?

661


Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..

2397


length where bent up is made in slab of bridge from one end

1445






What is the zero value in quantity surveying

2006


Calculation of Pier Cap with tapper area?

5761


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

1488


in staad ,why we realease a moment of a member ? what is affect if we realease a moment

1725


What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

1951


hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

1951


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2033


225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

2919


Explain the difference between shear and tensile strength.

651


Define What is the distance between railway tracks?

677