Answer Posted / saadsms
Hi
the in side cond,s will be less in size than the main cable
(out feeder) because they are branches to feed several loads.
their sizes may be ( 6,4,2.5,1.5 ) mm2.
and must be stranded isolated s.c wire to be flixible.
saad
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
in shunt clippers why a resistor is used in sereis with the input
please send me jindal previous aptitude and technical question and answer.my email id is deep_raj@live.com
what is the use of current transformer in power transformer secondary side.?its connectyed in WTI
(1)WHAT HAPPENS WHEN SUDDENLY LOAD GIVEN TO THE INDUCTION MOTOR ? (2)CAN WE MAKE WOOD AS MAGNET ? (3)WHAT IS THE VALUE OF MAGNETIC FLUX DENSITY IN TRANSFORMER ? (4)WHY WE ARE USING ELECTROMAGNETI NOT ELECTROSTATIC IN MACHINE ?
WHAT IS DEGREE OF COMPOUNDING IN D.C MACHINE MEANS? HOW TO READ THE OPERATING CHART FOR ANY ELECTRICAL MACHINES?
electrical ques
what is the difference between electrical choke and electronic choke?
In what cases (circumstances)we should apply P controller, PD controller, PI controller & PID controller ?
why the field winding in dc motor is not short circuited eventhough dc supply is applied across the winding
when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//
What do you understand by avr?
should %impedance be high or low in a power transformer? if so why?
What shall be the secondary output voltage if the primary winding of a 220/6V, 50 Hz transformer is energized by an 110V, 60 Hz supply?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
What is the Resposiblity of Electrical Utility Engineer