What is meant by 'zero value' in quantity surveying.
Answer Posted / bhanu prakash
Zero Value in Quantity Surveying is value where we are
starting the work of Surveying. i.e . the initial position
or starting point of Survey.
| Is This Answer Correct ? | 23 Yes | 9 No |
Post New Answer View All Answers
Define What are the uses of Groynes?
Which is stronger solid steel rod or hollow steel pipe?
in the earthquqke the profile of water on dam is parabolic or not
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
I have an span length 16 ft c/c
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
What is thumb rule in quality and quantity estimation of a Residential building??
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
What is thumb rule for deep trench excavation
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
What is kn measurement?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.