What is meant by 'zero value' in quantity surveying.
Answer Posted / bhanu prakash
Zero Value in Quantity Surveying is value where we are
starting the work of Surveying. i.e . the initial position
or starting point of Survey.
| Is This Answer Correct ? | 23 Yes | 9 No |
Post New Answer View All Answers
What is a hatch patterns?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
what is the composition of good brick ?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
what does the track parameter mean in staad.pro?
How do you calculate the power of a centrifugal pump?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
What are the Types Of DPC and its Thickness used?
how to calculate the concrete mix m30 by volume
Special thing in designing a overhead reservoir ? which is different from an ordinary design
In which code the the maximum height of concrete casting has been explained
Which brick is best for construction ,either fly ash or AAC BLOCKS
what is mean by reestimation?