how to calculate cost for MS plate shuttering
(show calculation/assumptions)
Answer Posted / prashanth
Assume that the shuttering sheet size is 3'X2'
Sheet thickness of 6mm.
Side angle is of 25x25x3mm.
Take a lumsum for welding.
Tools & Planks.
Logistics.
Tax.
Profit.
| Is This Answer Correct ? | 24 Yes | 5 No |
Post New Answer View All Answers
explain the advantages of total stasion
What are some structures that may be subjected to fatigue?
why & what is perchatage we are using fly ash in concrete?
it is a corrected question." make a list of engineering property(properties) of soil.
what is conrete grade ,how are depent on concrete grad and size of concrete?
Any strength is a stress but any stress is not strength
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What are the disadvantages while using stone dust as filler in pavements?
What is aggregate?
plz.show development and anchorage length in simple diagram.
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
How to testing voids of filled aggregate in bitumen mix design
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING