Can anybody explain what is cut-over activity in FI and how
we do that ?
Answer Posted / mateen shaikh
Cutover activity comes under Realization phase of
implementation, after configuration (this configuration
does not include complete configuration/transfer all data
from legacy system to SAP but only base line configuration)
then unit testing and Integration testing then if every
thing is working fine consultants confirmed and jump to
another phase i.e. Final preparation i.e. End User traning
and User Acceptance Test so, the moment which is before
final preparation phase is called Cut Over Activity.
Hope you all like this KT.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
i want to check whether the particular cost center is assigned to which Controlling cycle.
What is a local currency and parallel currency?
will please anybody forward the project report on sap fico? my mail id : sriramy@gmail.com
Name three ways of posting acquisition cost to a fixed asset master?
How do you define a co-product in sap?
How many normal and special peroids can be there in a fiscal year? How do you open and close periods?
what do you mean by the field status group?
Explain manual primary cost planning? : co- cost center accounting
Explain complex assets and asset sub numbers? : fi- asset accounting
What are internal tables check table, value table, and transparent table?
What is a ZM entry, is it recorded in the general ledger, and what does it do?
Why doesn't the system allow you to change the tax category in a gl account master? : fi- general ledger accounting
Explain the value of creating a cost center?
What is pre-closing? : fi- general ledger master data
Suppose we have created a PO with qty 100 Ton and we have done MIGO with qty 99 Ton and after that we have MIRO 100 Ton. Interviewer asked me how can we load the difference qty balance of migo and miro (100-99=1ton) on material? please help regards sandeep.