What is the difference between forward scheduling and
backword scheduling???
Answer Posted / hari85
Hi
During the sales order processing if the material is
available system calculate the Backward scheduling. if the
material is not available then system calculate the forward
scheduling.
Thanks&Regards
Hari
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
In interviews interviewers asked me "what is your responsibility in your project?". what is the answer for this question. Pls tell me the answer anybody. Thanks in advance.
List the basic elements of a customer master record?
What is the client-specific data?
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.
The pl00 condition is fine in delivery. But when we try to print to either the screen or printer, an error v1032 occurs. Why?
What does the account group of the customer control?
Explain about your role in current/previous project? (If you have one)
How higher level item category is controlled?
how can I do (config)? if my product category like this 1 product brand exam 101 brand A, 102 brand B 2 product type exam 501 type water, 502 type resin my sale deal is every customer can buy mix product category if buy 400.00 each can get free goods 10.00 each from any product in mix cat exam customer order line brand type quantity 1 101 501 100.00 2 101 502 100.00 3 102 501 100.00 4 102 502 100.00 mean customer meet target can get free 10.00 each but customer can select material in mix category chot trinnamaitip
Do you know what is made to order scenario or make-to-stock scenario? SO, in the make-to-order scenario, what’s the integration touchpoint that you figure MRP? My question is when you have a make-to-order scenario, how does MRP will be figured? How system know that when you create a sale order whether the sale order is calling for make to order or make to the stock type of order, which data determined this is made to order make to stock…. The system should understand when I create an order, whether it’s made to order or make to stock, so which parameter which value that system will be determined based on that system will say okay this make to order so I need to I mean the system has to go to the next level then it’s going to the MRP all the subsequent planning will be taken taking place, what’s the parameter that we have to check?
What are the main and sub modules in sap?
What is alternative condition type? Give an example?
one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance
What is item category and how is it determined?
Tell me your Current client's organization structure in relation to SAP SD in your project? Draw / illustrate with a diagram.I have been asked this question in an recent interview. Please reply asap... Eagerly awaiting for your response? Thanks in advance.