A bill was raised by contractor which read as follows
1.) Excavation in normal soil upto 1.5m - 250 cum
2.) Excavation in normal soil 1.5m to 3m - 240 cum
3.) Excavation in soft rock - 350 cum
4.) Excavation in hard rock - 250 cum
5.) Filling with available soil - 825 cum
6.) Filling with bought out soil - 1100 cum
How can I verify the above quantities, especially for item
no. 5 & 6?
What checks are necessary before releasing the bill ?
Answer Posted / u.arunkarthick
here the total excavation qty is 1090 m3, then minus the qty
of concrete used for footing and add consolidation of soil
as 2 to 3%, example if we excavate 1m*1m*1m = 1m3 of
excavated earth is there, then refill that area needs 1.2m3
because of soil consolidation.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
what are the types of design? which type of method is used at what type of design & why?
what is high type road and low type roads
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
What is thumb rule for deep trench excavation
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
What is difference between code and standard and specification?
Design a rectangular channel.
what is castigliano theaorem
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
What is the biggest dam in america?
Did any of the egyptian pyramids ever fall down?
what is parametre for M25 after 7 days strength
what is the Asfalt test?in road constraction..?