I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / sobhanbabu
it depends upon length and width of the slab.maximum is 28
days.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
what motivates you to do a good job
How to build the floor to ceiling bookcase?
How to calculate the force on a column of three story building. What should be the base concrete height?.
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
How do you compute the volume of airflow?
Define current ucs?
What is quantity of cement and sand required for 2000sqft of tiling?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
How does a traffic light signal work ?
How are freeway bridges built?
Basic civil interview questionsÂ
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?